Northcliff North Queensferry
Northcliff wall and Garage Reinstatement
Client: Private
Location: North Queensferry
Principal Contractor: Menzies
Sector: Insurance
Project Duration: 12 Weeks
Overview
Menzies was appointed to undertake the stabilisation and reconstruction of a failed stone wall section, followed by the full reinstatement of an adjoining garage at North Queensferry.
The project required a carefully engineered approach to ensure structural stability throughout demolition and reconstruction works. Temporary support systems, reinforced concrete foundations, masonry reconstruction, and garage reinstatement works were delivered to provide a long-term solution while preserving the character of the existing structure.
Structural Stabilisation & Temporary Works
The initial phase of the project focused on stabilising the existing structure and creating safe working conditions for the reconstruction works.
Temporary works were designed and installed using an A-frame propping system fixed to the existing garage floor slab, providing structural support throughout demolition and rebuilding operations.
This approach ensured the project could proceed safely while maintaining stability across the affected structure.
Foundations & Reconstruction
Following investigation and engineering assessment, the failed wall section was carefully dismantled and prepared for reconstruction.
A test rock anchor was installed and pull-tested before reconstruction commenced. New reinforced concrete foundations were formed to provide a stable base for the replacement structure.
The wall was rebuilt using controlled lifting techniques, incorporating rock ties and reinstated stonework to create a durable structure that remained sympathetic to the original appearance.
Masonry & Garage Reinstatement
Once the wall reconstruction was complete, the adjoining garage was fully reinstated.
Works included:
- Dense concrete blockwork construction
- Roof structure installation
- Reinstated doors and frames
- External render finishes
- Rainwater goods installation
Where possible, original materials were retained and incorporated into the completed works.
The finished scheme delivered a robust, engineered solution while maintaining the visual character of the property.
Project Outcome
The North Queensferry wall and garage reinstatement project was successfully completed within the 12-week programme.
Through careful planning, structural assessment, temporary stabilisation measures, and high-quality reconstruction works, Menzies delivered a durable long-term solution while preserving the character of the original structure.
Additional Case Studies

Pettycur Bay Holiday Park
Client: Pettycur Holiday Park
Sector:Civil Engineering

Elie Harbour Fife
Client: Elie Harbour Trust
Sector:Marine / Civil Engineering

Northcliff North Queensferry
Client: Private
Sector:Insurance

Ravenscraig Flats Kirkcaldy
Client: FCBS
Sector:Groundworks

RNLI Anstruther
Client: RNLI
Sector:Marine / Civil Engineering

Kinghorn & Lochore Play Areas
Client: Fife Council
Sector: Public Realm/Recreation

ITW Glenrothes
Client: ITW
Sector: Industrial

Glendevon BESS Project
Client: Gransolar Construction
Sector: Renewable

Flexcon Glenrothes
Client: Flexcon
Sector: Groundworks and enabling works

Grange Road, Earlsferry
Client: Mining Remediation Authority
Sector: Frameworks