Elie Harbour Fife
Harbour Wall Repointing Works
Client: Elie Harbour Trust
Location: Elie Harbour
Principal Contractor: Menzies
Sector: Marine / Civil Engineering
Project Duration: 6 Weeks
Overview
Repointing works were undertaken to the external face of the harbour wall at Elie Harbour.
Due to restricted access, tidal constraints, and the vertical nature of the structure, the works were delivered using specialist rope access techniques. A dedicated rope access subcontractor carried out the repointing operations externally over the wall face, eliminating the need for large-scale access plant or ground-based scaffolding.
In addition to the repointing works, stone step repairs were carried out within the harbour structure. This included the careful removal, repositioning, and reinstatement of individual stone units weighing up to 1 tonne, requiring controlled lifting operations and precise setting to maintain alignment, stability, and durability within the marine environment.
Working Within a Marine Environment
Due to the location and structure of the harbour wall, traditional access methods were not suitable for the project.
Specialist rope access techniques were utilised to allow safe access to the external face of the harbour wall, eliminating the need for large-scale scaffolding or extensive access plant.
This approach enabled the repointing works to be completed efficiently while minimising disruption to harbour operations and surrounding areas.
Harbour Wall Repairs
The primary scope of works involved repointing sections of the harbour wall to preserve the structure and improve its long-term durability within a coastal environment.
Working in tidal conditions required careful coordination and planning to ensure safe access and consistent quality throughout the project.
The completed repairs helped protect the integrity of the harbour structure while maintaining its operational functionality.
Stone Step Restoration
In addition to the repointing works, stone step repairs were undertaken within the harbour.
The works included the careful removal, repositioning, and reinstatement of individual stone units weighing up to one tonne.
These operations required controlled lifting techniques and precise placement to maintain alignment, stability, and durability within the marine environment.
Project Outcome
The harbour wall repointing works were successfully completed within the six-week programme.
Through careful planning, specialist access methods, and experienced project delivery, Menzies helped preserve an important harbour structure while ensuring safe working practices and minimal disruption throughout the project.
Additional Case Studies

Pettycur Bay Holiday Park
Client: Pettycur Holiday Park
Sector:Civil Engineering

Elie Harbour Fife
Client: Elie Harbour Trust
Sector:Marine / Civil Engineering

Northcliff North Queensferry
Client: Private
Sector:Insurance

Ravenscraig Flats Kirkcaldy
Client: FCBS
Sector:Groundworks

RNLI Anstruther
Client: RNLI
Sector:Marine / Civil Engineering

Kinghorn & Lochore Play Areas
Client: Fife Council
Sector: Public Realm/Recreation

ITW Glenrothes
Client: ITW
Sector: Industrial

Glendevon BESS Project
Client: Gransolar Construction
Sector: Renewable

Flexcon Glenrothes
Client: Flexcon
Sector: Groundworks and enabling works

Grange Road, Earlsferry
Client: Mining Remediation Authority
Sector: Frameworks