Menzies was appointed to construct a reinforced concrete press foundation for global manufacturer ITW at their Glenrothes facility. Menzies built the foundation to support a new high-performance press, supplied and installed by Aida.

With heavy load requirements and tight tolerances, this project demanded accuracy, careful planning, and zero disruption to live operations.

From Design to Site:
Getting It Right First Time

Our team was involved from the early stages of the project, providing support during:

  • Structural design reviews
  • Reinforcement detailing and bending schedules
  • Early procurement of steel to keep things on programme

This early input ensured the construction phase moved forward without delay.

Construction Activities

On site, the works were delivered in multiple stages:

  • The team installed perimeter fencing to isolate the area safely
  • We saw-cut and removed the existing 150mm concrete slab, with all waste taken to licensed facilities
  • The team completed the excavations to reach the foundation formation level, followed by backfilling with compacted type 1 sub-base and installation of a 1200-gauge DPM

The team constructed the foundation over three separate concrete pours:

  • Pour 1: Base foundation, including reinforcement and high-strength concrete
  • Pour 2: Excavation widening and cable track, including dowels, formwork, and additional reinforcement
  • Pour 3: Final layer and surface finish, ready for press installation

Between pours, we installed reinforcing steel assemblies and rails provided by Aida.

Specialist Input: Fabricated Steel Railings

For steelwork and edge protection, we partnered with Archway Metals, who supplied and installed fabricated steel railings to spec. Their input ensured the final setup met both safety and aesthetic requirements.

Finishing Touches

To complete the job:

  • The team installed gratings over cable tracks
  • The team finished all surfaces flush and clean.
  • The site was fully demobilised, ready for press commissioning by the client’s engineering team

Strong Fuondtions, Delivered

This was a technically demanding job, but with our experienced in-house team and close coordination with subcontractors, we delivered a high-performance foundation on time, on budget, and to spec.

Additional Case Studies


Aerial view of Pettycur Bay Caravan Park in Kinghorn with coastal holiday homes overlooking the Firth of Forth.
Slipway and stone harbour wall at Elie Harbour overlooking the Fife coastline
Menzies site team inspecting works beside an excavator at the Ravenscraig Flats Kirkcaldy project
Industrial process equipment and ductwork installed at the Flexcon Glenrothes facility
Share this project