Glendevon BESS Project

Foundations Package


Client: Gransolar Construction
Location: Old Gallows Road, Perth
Sub Contractor: Menzies
Sector: Renewable
Project Duration: 30 weeks

Overview


Gransolar appointed Menzies as the specialist civil subcontractor for the Battery Energy Storage System (BESS) foundations package at the Glendevon site in Perth.

The project included construction of structural foundations for multiple key assets including the Twin Skid Power Station, DNO room, Customer Room, and auxiliary transformer bases.

In addition to structural bases, we also completed blockwork to the Customer Room and the acoustic fence.

Scope of Works

Twin Skid Power Station Foundations
The team constructed two distinct foundation types, cut level and increased level, both incorporating:

  • Excavation and disposal to designated spoil areas
  • Geotextile and biaxial geogrid layers
  • Type 1/Type 2 sub-base build-up with layer by layer compaction
  • Gen 3 blinding and C32/40 structural concrete
  • Full A393 mesh reinforcement (4 layers), perimeter “U” bars, and formwork
  • Steel float finish and service void formation

DNO Foundation

  • Excavation to formation and installation of geotextile and Type 1 sub-base
  • Full foundation slab and structural wall construction
  • Complex reinforcement, wall formwork, and C32/40 vertical concrete pours
  • Backfilling and blackjack application to external walls as per variation

Custom Room Foundation

  • Excavation, geotextile layer, and Type 1 build-up
  • 200mm mass concrete blinding widened for stability
  • Formation of base and column foundations with full reinforcement and C32/40 pours
  • Final backfilling to spec

Auxiliary Works and Variations

  • Construction of 2nr auxiliary transformer bases
  • Adjustments for foundation types (1 increased level added, 1 cut level removed)
  • C50 concrete supply for specified areas
  • The team completed additional formwork and CBR testing
  • Relocation of 100t Type 1 material

Acoustic Fence

  • The team excavated, compacted, and built the foundations with reinforced concrete to support the acoustic fencing.
  • A solid base was formed using compacted sub-base, GEN 3 blinding, and high-strength C40 concrete.
  • Two layers of mesh reinforcement were included for added durability.
  • The concrete was finished smoothly and baseplates grouted in place for secure fence installation.

Outcome

All elements were delivered in line with design specifications and project sequencing. Close coordination with Gransolar ensured smooth progression through phased activities. The project was completed safely and to quality.

Additional Case Studies


Aerial view of Pettycur Bay Caravan Park in Kinghorn with coastal holiday homes overlooking the Firth of Forth.
Slipway and stone harbour wall at Elie Harbour overlooking the Fife coastline
Menzies site team inspecting works beside an excavator at the Ravenscraig Flats Kirkcaldy project
Industrial process equipment and ductwork installed at the Flexcon Glenrothes facility
Share this project