ITW Glenrothes
Press Foundation
Client: ITW
Location: Glenrothes, Fife
Principal Contractor: Thomas Menzies Builders Ltd
Sector: Industrial
Project Duration: 10 weeks
Overview
Thomas Menzies Builders Ltd. was appointed to construct a reinforced concrete press foundation for global manufacturer ITW at their Glenrothes facility. The foundation was purpose-built to support a new high-performance press, supplied and installed by Aida.
With heavy load requirements and tight tolerances, this was a project that demanded accuracy, planning — and zero disruption to live operations.
From Design to Site:
Getting It Right First Time
Our team was involved from the early stages of the project, providing support during:
- Structural design reviews
- Reinforcement detailing and bending schedules
- Early procurement of steel to keep things on programme
This early input ensured the construction phase moved forward without delay.
Construction Activities
On site, the works were delivered in multiple stages:
- Perimeter fencing was established to isolate the area safely
- We saw-cut and removed the existing 150mm concrete slab, with all waste taken to licensed facilities
- Excavations were carried out to reach the foundation formation level, followed by backfilling with compacted type 1 sub-base and installation of a 1200-gauge DPM
The foundation was constructed over three separate concrete pours:
- Pour 1: Base foundation — including reinforcement and high-strength concrete
- Pour 2: Excavation widening and cable track — including dowels, formwork, and additional reinforcement
- Pour 3: Final layer and surface finish — ready for press installation
Between pours, we installed reinforcing steel assemblies and rails provided by Aida.
Specialist Input: Fabricated Steel Railings
For steelwork and edge protection, we partnered with Archway Metals, who supplied and installed fabricated steel railings to spec. Their input ensured the final setup met both safety and aesthetic requirements.
Finishing Touches
To complete the job:
- Gratings were installed over cable tracks
- All surfaces were finished flush and clean
- The site was fully demobilised, ready for press commissioning by the client’s engineering team
Strong Fuondtions, Delivered
This was a technically demanding job — but with our experienced in-house team and close coordination with subcontractors, we delivered a high-performance foundation on time, on budget, and to spec.
Additional Case Studies

Pettycur Bay Holiday Park
Client: Pettycur Holiday Park
Sector:Civil Engineering

Elie Harbour Fife
Client: Elie Harbour Trust
Sector:Marine / Civil Engineering

Northcliff North Queensferry
Client: Private
Sector:Insurance

Ravenscraig Flats Kirkcaldy
Client: FCBS
Sector:Groundworks

RNLI Anstruther
Client: RNLI
Sector:Marine / Civil Engineering

Kinghorn & Lochore Play Areas
Client: Fife Council
Sector: Public Realm/Recreation

ITW Glenrothes
Client: ITW
Sector: Industrial

Glendevon BESS Project
Client: Gransolar Construction
Sector: Renewable

Flexcon Glenrothes
Client: Flexcon
Sector: Groundworks and enabling works

Grange Road, Earlsferry
Client: The Mining Remediation Authority
Sector: Frameworks