Carrs Flour Mills, Kirkcaldy
Grain Silo Foundation & Structure
Client: Carrs Flour Mills Ltd
Location: East Bridge, Kirkcaldy
Principal Contractor: Thomas Menzies Builders Ltd
Sector: Civil Engineering
Project Duration: 16 weeks
Project Overview
Thomas Menzies (Builders) Ltd was appointed as Principal Contractor for the construction of a reinforced concrete foundation and structural elements to support a new grain silo at Carrs Flour Mills in Kirkcaldy.
The project demanded precision, careful planning, and excellent coordination due to the operational nature of the site and tight delivery schedules.
Scope of Works
- Construction of a 600mm thick heavily reinforced concrete raft ground slab, supported on a pre-piled formation
- Installation of 24 circular reinforced concrete columns, each 500mm in diameter and 2000mm high
- Formation of a 600mm thick hexagonal suspended flat slab, supported by the columns
- Extensive temporary soffit decking to support the suspended slab during the pour
- All concrete works carried out using pumped concrete methods
Design Responsibilities
- Contractor-Designed Elements:
- Temporary works design for soffit shuttering
Project Challenges & Solutions
- Confined Site:
Located within a busy, fully operational flour mill, the project required careful sequencing of works to maintain safety and minimise disruption to the client’s ongoing operations. - Tight Programme Deadlines:
The project was driven by strict deadlines for the delivery and erection of the new grain silo. Thomas Menzies coordinated closely with the client and supply chain to ensure that all structural elements were delivered and installed on time. - Complex Structural Requirements:
The heavily reinforced slab and elevated suspended slab required detailed formwork and concrete placement strategies, successfully executed by our experienced team.
Project Team
- Consulting Engineer: Alexander Scott Design (Pioneer Hub)
- Principal Contractor: Thomas Menzies (Builders) Ltd
Outcome
The successful delivery of the silo foundation has contributed to Carrs Flour Mills’ ongoing production capacity and infrastructure upgrades.
Additional Case Studies

Pettycur Bay Holiday Park
Client: Pettycur Holiday Park
Sector:Civil Engineering

Elie Harbour Fife
Client: Elie Harbour Trust
Sector:Marine / Civil Engineering

Northcliff North Queensferry
Client: Private
Sector:Insurance

Ravenscraig Flats Kirkcaldy
Client: FCBS
Sector:Groundworks

RNLI Anstruther
Client: RNLI
Sector:Marine / Civil Engineering

Kinghorn & Lochore Play Areas
Client: Fife Council
Sector: Public Realm/Recreation

ITW Glenrothes
Client: ITW
Sector: Industrial

Glendevon BESS Project
Client: Gransolar Construction
Sector: Renewable

Flexcon Glenrothes
Client: Flexcon
Sector: Groundworks and enabling works

Grange Road, Earlsferry
Client: The Mining Remediation Authority
Sector: Frameworks