Ravenscraig Flats Kirkcaldy
Groundworks and Enabling Works
Client: FCBS
Location: Kirkcaldy
Principal Contractor: Thomas Menzies Builders Ltd
Sector: Groundworks
Project Duration: TBC
Overview
The project involved comprehensive site preparation for a large scaffold, including excavation to reduce levels, disposal of materials, and laying compacted Type 1 hardcore. Waterproofing was achieved through geotextile membranes, while existing paving slabs were carefully reinstated on sand beds and surfaces were levelled to falls.
Topsoil was spread with fertilizer, followed by amenity grass seeding. Temporary trenches were constructed for water, drainage, electrical, and telecommunications services, with connections made to existing mains and concrete plinths installed for temporary service boxes. Site security was ensured through the supply, installation, and removal of Heras fencing, gates, and pedestrian barriers.
Testing and surveys, including CBR, plate bearing, and GPR surveys, were carried out to verify ground conditions and locate buried services, while traffic management and certified labour ensured safe and compliant operations, resulting in a prepared, organized, and functional site ready for further construction.
Additional Case Studies

Pettycur Bay Holiday Park
Client: Pettycur Holiday Park
Sector:Civil Engineering

Elie Harbour Fife
Client: Elie Harbour Trust
Sector:Marine / Civil Engineering

Northcliff North Queensferry
Client: Private
Sector:Insurance

Ravenscraig Flats Kirkcaldy
Client: FCBS
Sector:Groundworks

RNLI Anstruther
Client: RNLI
Sector:Marine / Civil Engineering

Kinghorn & Lochore Play Areas
Client: Fife Council
Sector: Public Realm/Recreation

ITW Glenrothes
Client: ITW
Sector: Industrial

Glendevon BESS Project
Client: Gransolar Construction
Sector: Renewable

Flexcon Glenrothes
Client: Flexcon
Sector: Groundworks and enabling works

Grange Road, Earlsferry
Client: The Mining Remediation Authority
Sector: Frameworks